MEDITERRANEAN CTR, S.L. | Waste treatment company
Services performed
-Installation of an atomized plant. The work carried out by IAG has consisted of the construction of a 24 m high warehouse to house the production equipment, design and monitoring of installation works (LV, plumbing, water storage, natural gas, fire protection and compressed air). for the commissioning of the plant.
-Transfer project for a hazardous waste stabilizer plant. The work carried out by IAG has consisted of the design and monitoring of works for the construction of waste storage and stabilization barns, design and monitoring of works of the different facilities that make up the plant: low voltage, discharge and storage of liquid waste, suction and filtering, plumbing, and fire protection.